Construction of Loop 3 – Hersek – Yumurtatepe from Reconstruction & Expansion of the existing natural gas pipeline system Russia – Turkey”

Client: Turkey Pasiner - Fernas
Period: 1998
Length: 48
Diameter: 600
Description:
Civil and installation works, test, incl. preparation of ROW, excavation works, back-filling, stringing, all welding works, installation of valves, insulation coating on welded joints, crossings, field pipe bending, water filling and hydrotest, drying of the pipeline, NDT test.
tuf
tuf2
ser3