Landslide stabilization in village Planinitsa, Pernik Region
Client: Pernik Municipality
Period: 07.07.2010 07.09.2010
Description:
The project includes execution of the following stabilization works:
1. Drainage of groundwater and surface drainage.
- execution of water intakes with rectangular cross sections and concrete lining covered with a removable grid;
- the construction of drainage ditches.
2. Stabilization by retaining wall and pile system /158 pcs. reinforced steel piles with remaining metal tube/. The retaining reinforced concrete wall is with a constant height. It should be done at the regulation line of the street.
3. Restoring of the asphalt coverage of the roadway /both pavements should be implemented as well as the roadway to be asphalted, to be executed ditch that enters into the pavement and should be covered with metal grids.
4. Execution of Monitoring measuring and control system. It is essential for the security of the newly established facilities, as well as to ensure the stability of the slope above the main landslide slope.