Relocation and reconstruction of the TMF seepage collection system of Chelopech Mining EAD
Client: Chelopech Mining EAD
Period: 07.2009 12.2009
Description:
The execution of the project includes the following:
1. Drainage pump station;
2. Reconstruction of the existing pump station;
3. Underdrainage;
4. Seepage transfer drain;
5. Geodesic network points;
6. Access road renovation;
7. Dismantling of the old pump station;
8. Main TMF embankment upgrae - Phase I.