Construction and Installation of cooling water pipeline (BONNA pressure reinforced concrete pipes)
Client: TPP “Maritsa East 1” / TGO, Turkey
Period: 07.01.2007 25.02.2009
Length: 1.53
Diameter: 2100
Description:
Very specific is the assembling of the reinforced concrete pipes type BONNA (diameter 2100 mm) that “Gasstroymontaj” JSC executed at TPP “Maritsa East 1” in 2007-2008 successfully.
The specialized pipeline equipment which the company has, its personnel and long experience helped the company to implement successfully this specific project..
„Gasstroymontaj” JSC implemented the following works:
- excavation works;
- backfilling with sand – sand bedding;
- geotextile placing under the pipes;
- loading and transport of reinforced concrete pipes, type BONNA;
- installation of BONNA reinforced concrete pipes (φ2100/1800mm)
- welding of BONNA reinforced concrete pipes joints
- installation and dismantling of temporary blinds (φ2100/1800mm) for pressure testing
- hydrostatic test of φ2100mm pipe with 6 bar;
- filling and backfilling.