Construction and Installation of cooling water pipeline (BONNA pressure reinforced concrete pipes)

Client: TPP “Maritsa East 1” / TGO, Turkey
Period: 07.01.2007 25.02.2009
Length: 1.53
Diameter: 2100
Description:

Very specific is the assembling of the reinforced concrete pipes type BONNA (diameter 2100 mm) that “Gasstroymontaj” JSC executed at TPP “Maritsa East 1” in 2007-2008 successfully.
The specialized pipeline equipment which the company has, its personnel and long experience helped the company to implement successfully this specific project..
„Gasstroymontaj” JSC implemented the following works:

  • excavation works;
  • backfilling with sand – sand bedding;
  • geotextile placing under the pipes;
  • loading and transport of reinforced concrete pipes, type BONNA;
  • installation of BONNA reinforced concrete pipes (φ2100/1800mm)
  • welding of BONNA reinforced concrete pipes joints
  • installation and dismantling of temporary blinds (φ2100/1800mm) for pressure testing
  • hydrostatic test of φ2100mm pipe with 6 bar;
  • filling and backfilling.