Engineering, Procurement and Construction of GRP Pipeline for Cooling Water from “Rozov Kladenets” artificial lake to TPP “Maritsa East 3”
Client: TPP “Maritsa East 3 Power Company”
Period: 22.04.2005 03.08.2006
Length: 18
Diameter: 800 - 600
Description:
„Gasstroymontaj” JSC implemented the following works:
- 1.Construction of GRP pipeline φ800 – 9980m.
- 2.Construction of GRP pipeline φ600 – 8820m.
- 3.Excavations – 66 868.02 m3.
- 4.Construction of 40 shafts and installation of pipes and polypropylene fittings.
- 5.Construction of 7 shafts and installation of stop valves and reverse valves.
- 6.10 Crossings of railway and roads with dia. over 1500mm.