Stabilization of the excavation of MALL of VARNA Drilling and Casting in-situ of 400 piles, φ 600mm, unit depth 12m

Client: “Zhelev 93-Zhivko” Varna/Bulgaria
Period: 23.10.2007 28.02.2008
Description:
tuf
tuf2
ser3