Landslide Stabilization in “Slanchev Den” Resort and Road I-9 Varna – “Zlatni Piasatsi” Casting in-situ of 318 piles, φ800mm, 4586m total depth Casting in-situ of 330 piles, φ600mm, 6105m total depth Execution of strand anchors with load capacity 40t, total length 2173m Execution of strand anchors with load capacity 60t, total length 3762m
Client: Bulgarian Ministry of Regional Development and Public Works, Financing by the EU
Period: 30.10.2003 30.12.2005
Description:
“Gasstroymontaj” JSC performed civil engineering works on landslide protection in “Sunny Day” Resort, near to the town of Varna – on the Black sea coast. The project was awarded after tendering under Programme ISPA of EC. The financing of the project is from EIB.
Some of the works included in the project were:
- Casting in-situ of 318 piles, DN800mm, 4586m total depth
- Casting in-situ of 330 piles, DN600mm, 6105m total depth
- Execution of strand anchors with load capacity 40t, total length 2173m
- Execution of strand anchors with load capacity 60t, total length 3762m.