| Construction of a drainage system around the temporary depots of Lead and Zinc Complex JSC, Kurdzhali |
Lead-Zink Complex JSC, Kurdzhali |
01.2012 10.06.2012 |
| Relocation and reconstruction of the TMF seepage collection system of Chelopech Mining EAD |
Chelopech Mining EAD |
07.2009 12.2009 |
| Repairs of existing oil pipeline at the following crossings: Under railway village Zimnitza – Sliven town (30m) Under asphalt road village Zheliu Voivoda – village Kaloianovo (60m) |
“GP Group” Ltd |
14.07.2008 15.11.2008 |
| Ash-carrier pipelines – Relocation of ash-carrier pipelines: 1st Stage: Execution of foundations for basalt ash-carrier pipelines |
TPP “Maritsa East 3” |
08.02.2005 28.02.2006 |
| Reconstruction of 2 Cathodic Protection Stations “Zhelju Voivoda” and “Kamen” |
“Bulgargaz” EAD |
27.06.2005 30.08.2005 |
| Construction of Communication Cable Line in the section between “Burgas” and “Debelt” Automatic Gas Distribution Stations |
“Bulgargaz” EAD |
27.06.2005 30.09.2005 |
| Railway Part of Port of Burgas Expansion Project: Subcontract Agreement for Railway Works |
Penta Ocean – Mitsubishi JV/ National Company “Railway Infrastructure” |
15.09.2003 30.06.2005 |
| Reconstruction, rehabilitation and extension of European Highway E79 “Dupnitsa – Daskalovo” section; General Sub-contractor |
“Bulstroy Engineering”JSC |
2002 2004 |
| Installation Works for Replacement of Compensators and Valves, Lot A |
“Toplofikatsia Sofia” EAD |
2004 |
| Contract №211/11.07.2001 for BTS (base transceiver station) – Design, Civil and Installation Works of 10 pcs BTS for the 2nd GSM operator in Bulgaria – “GLOBUL in Varna and Burgas |
“Intracom Constructions”, Greece |
2001 |
| Contract №PRC5/21.12.2001 –Civil and installation works of BTSs (in town, agricultural and forest areas) for the 2nd GSM Operator in Bulgaria – GLOBUL |
“Intracom Bulgaria” OOD |
2001-2004 |
| Contract №PRC15/23.08.2002 – Construction, installation and legalization services of BTSs (in town, agricultural and forest areas) for the 2nd GSM Operator in Bulgaria – GLOBUL |
“Intracom Bulgaria” AD |
2002 2005 |
| Sofia District Heating Rehabilitation Project: Lot 1&3: Procurement of additional equipment and Construction & Installation Works for 735 District Heating Substations |
“Toploficatsia Sofia” EAD |
2002 |
| Sofia District Heating Rehabilitation Project: Lot 1&3: Procurement of additional equipment and Construction & Installation Works for 735 District Heating Substations |
“Toplofikatsia Sofia” EAD |
2002 |
| Construction and installation of HDPE pipeline for fibre-optic cable parallel to the Transit gas pipeline to Greece: Sections 20 and 21 – length 45km, DN40mm Section 19 – length 20km, DN40mm |
“Bulgargaz” EAD |
2000 2001 |
| Construction ans Installation of HDPE pipeline for fibre-optic cable parallel to the Transit gas pipeline No.2 to Turkey, Greece, Macedonia and Yugoslavia: Loop 1 – from Bulgarian – Romanian border to Odrintsi village - 45km, DN40mm Loop 2 – from Liuliakovo village to CS “Lozenets” – 45km, DN40mm |
“Bulgargaz” EAD |
2000 |
| Construction and installation of HDPE pipeline for fibre-optic cable parallel to Transit gas pipeline to Turkey from Nedialsko village to CS “Strandja” – 45km, DN40mm |
“Bulgargaz” EAD |
1999 |