other Projects

Project

Client

Year

Construction of a drainage system around the temporary depots of Lead and Zinc Complex JSC, Kurdzhali Lead-Zink Complex JSC, Kurdzhali 01.2012 10.06.2012
Relocation and reconstruction of the TMF seepage collection system of Chelopech Mining EAD Chelopech Mining EAD 07.2009 12.2009
Repairs of existing oil pipeline at the following crossings: Under railway village Zimnitza – Sliven town (30m) Under asphalt road village Zheliu Voivoda – village Kaloianovo (60m) “GP Group” Ltd 14.07.2008 15.11.2008
Ash-carrier pipelines – Relocation of ash-carrier pipelines: 1st Stage: Execution of foundations for basalt ash-carrier pipelines TPP “Maritsa East 3” 08.02.2005 28.02.2006
Reconstruction of 2 Cathodic Protection Stations “Zhelju Voivoda” and “Kamen” “Bulgargaz” EAD 27.06.2005 30.08.2005
Construction of Communication Cable Line in the section between “Burgas” and “Debelt” Automatic Gas Distribution Stations “Bulgargaz” EAD 27.06.2005 30.09.2005
Railway Part of Port of Burgas Expansion Project: Subcontract Agreement for Railway Works Penta Ocean – Mitsubishi JV/ National Company “Railway Infrastructure” 15.09.2003 30.06.2005
Reconstruction, rehabilitation and extension of European Highway E79 “Dupnitsa – Daskalovo” section; General Sub-contractor “Bulstroy Engineering”JSC 2002 2004
Installation Works for Replacement of Compensators and Valves, Lot A “Toplofikatsia Sofia” EAD 2004
Contract №211/11.07.2001 for BTS (base transceiver station) – Design, Civil and Installation Works of 10 pcs BTS for the 2nd GSM operator in Bulgaria – “GLOBUL in Varna and Burgas “Intracom Constructions”, Greece 2001
Contract №PRC5/21.12.2001 –Civil and installation works of BTSs (in town, agricultural and forest areas) for the 2nd GSM Operator in Bulgaria – GLOBUL “Intracom Bulgaria” OOD 2001-2004
Contract №PRC15/23.08.2002 – Construction, installation and legalization services of BTSs (in town, agricultural and forest areas) for the 2nd GSM Operator in Bulgaria – GLOBUL “Intracom Bulgaria” AD 2002 2005
Sofia District Heating Rehabilitation Project: Lot 1&3: Procurement of additional equipment and Construction & Installation Works for 735 District Heating Substations “Toploficatsia Sofia” EAD 2002
Sofia District Heating Rehabilitation Project: Lot 1&3: Procurement of additional equipment and Construction & Installation Works for 735 District Heating Substations “Toplofikatsia Sofia” EAD 2002
Construction and installation of HDPE pipeline for fibre-optic cable parallel to the Transit gas pipeline to Greece: Sections 20 and 21 – length 45km, DN40mm Section 19 – length 20km, DN40mm “Bulgargaz” EAD 2000 2001
Construction ans Installation of HDPE pipeline for fibre-optic cable parallel to the Transit gas pipeline No.2 to Turkey, Greece, Macedonia and Yugoslavia: Loop 1 – from Bulgarian – Romanian border to Odrintsi village - 45km, DN40mm Loop 2 – from Liuliakovo village to CS “Lozenets” – 45km, DN40mm “Bulgargaz” EAD 2000
Construction and installation of HDPE pipeline for fibre-optic cable parallel to Transit gas pipeline to Turkey from Nedialsko village to CS “Strandja” – 45km, DN40mm “Bulgargaz” EAD 1999