| Emergency earth stabilization of landslide at km 379+000 at main road E-85 (1-5) Kardzhali-Cross Border Point Makaza |
TRACE Kardzhali JSC |
13.10.2011 21.12.2011 |
| Landslide stabilization and reconstruction of road section of Road III-376 Prevala-Rakitovo-Kostandovo km 10+100 |
Eko - Hidro - 90 LTD |
2010-2011 |
| Landslide stabilization of road IV - 16061 village Rebrovo - Yablanitsa |
Geolobby - Kiril Angelov SP |
08.12.2010 13.12.2010 |
| Stabilization of transitions to gas pipeline branches from Bulgartransgaz transmission system in operational area of Valchi dol |
Bulgartransgaz EAD |
2010-2011 |
| Stabilization of Main gas pipeline-south km 47,9 and its facilities |
Bulgartransgaz EAD |
2010-2011 |
| Landslide stabilization in village Planinitsa, Pernik Region |
Pernik Municipality |
07.07.2010 07.09.2010 |
Landslide Stabilization of East Quarter of Oriahovo Town – 2nd stage, at Danube River Bank Drilling and Casting in-situ of 328 piles, φ 800mm, 16m and 14m unit depth; Drilling and Casting in-situ of 34 piles, φ 400mm, 10m unit depth Execution of steel concrete self-drilling anchors type ІВО R51/33 – 120pcs.х36m; 45pcs.х30m; type ІВО R38/17 – 17pcs.х12m |
Bulgarian Ministry of Regional Development and Public Works |
26.06.2008 30.12.2010 |
| Stabilization of foundations of existing residential building in residential area Boiana, Sofia Execution of steel concrete self-drilling anchors type IBO R38/17 – 54pcs.x30m |
“Bondis” LTD |
14.10.2008 26.10.2008 |
| Stabilization of road Troian - Karnare Drilling and casting in-situ of 34 piles, φ 400mm, unit depth 8m |
“Pat Perfekt” JSC |
06.10.2008 06.11.2008 |
| Excavation and stabilization of the excavation for project „Office Building in Gorubliane region”, Sofia Drilling and casting in-situ of 80 piles, dia. 600mm, unit depth 12,5 m |
„Park” ADCIZ/ „Park Management Company” LTD |
25.07.2008 15.10.2008 |
| Stabilization of the excavation of MALL of VARNA Drilling and Casting in-situ of 400 piles, φ 600mm, unit depth 12m |
“Zhelev 93-Zhivko” Varna/Bulgaria |
23.10.2007 28.02.2008 |
| Stabilization of the foundations of building with servicing purpose, electric substation and underground parking lot, Dianabad, Izgrev Municipality–Sofia Casting in-situ of 105 piles, φ 600mm, unit depth 12m |
“MNI” LTD |
04.05.2007 25.05.2007 |
| Civil Works Contract No.158/25.10.2005 Landslide Stabilization in “Tchaika” Resort, Kabakum region, Varna, on the Black sea coast Casting in-situ of 32 piles, φ600mm, 12m unit depth |
Bulgarian Ministry of Regional Development and Public Works, Financing by the EU |
07.01.2006 20.05.2006 |
| Landslide Stabilization in “Slanchev Den” Resort and Road I-9 Varna – “Zlatni Piasatsi” Casting in-situ of 318 piles, φ800mm, 4586m total depth Casting in-situ of 330 piles, φ600mm, 6105m total depth Execution of strand anchors with load capacity 40t, total length 2173m Execution of strand anchors with load capacity 60t, total length 3762m |
Bulgarian Ministry of Regional Development and Public Works, Financing by the EU |
30.10.2003 30.12.2005 |
| Landslide Stabilization in “Tchaika” Resort, Kabakum region, Varna, on the Black sea coast Casting in-situ of 334 piles, φ800mm, 5465m total depth Casting in-situ of 537 piles, φ600mm, 6988m total depth Execution of 49pcs strand anchors with load capacity 80t, unit length 30m |
Bulgarian Ministry of Regional Development and Public Works, Financing by the EU |
12.06.2001 03.08.2003 |
| Protection of the Danube Riverbank against Erosion, Zone IV Islands Batin & Vardim, km 530 000 – km 539 200 |
Bulgarian Ministry of Regional Development and Public Works, Financing by the EU |
30.12.2003 30.08.2006 |
| Emergency earth stabilization of the demolished sections at the destination of 9th railway line Ruse – Kaspichan, Bulgaria, in the interstation distance “Samuil – Visoka poliana”, Varna Region, from km 93 + 820 up to km 93 + 870 on the right |
“Kram Kompleks” LTD |
06.01.2006 31.08.2006 |
| Emergency earth stabilization works of the railway road and the facilities along the 16th railway line in the section Velingrad station – Tsvetino station – Avramovo station, Plovdiv region |
National Company “Railway Infrastructure” |
06.01.2006 18.05.2006 |
| Elimination of the natural calamity result and execution of stabilization and drainage works in landslide area at IV major railway line Ruse – Stara Zagora, Bulgaria, in the interstation distance Drianovo – Tsareva livada, Gorna Oriahovitsa region, in the section from km 161+472 up to 164+584 |
National Company “Railway Infrastructure” |
01.12.2005 25.07.2006 |
| Emergency earth stabilization works of railway road Ihtiman – Mirovo – Kostenets, from km 69+250 up to km 69+360 on Bulgarian national railway road 1 and 2 Drilling and casting in-situ of 154 piles, φ800mm, 6m unit depth |
“Kram Kompleks” LTD |
20.08.2005 30.09.2005 |
| Design and construction of strengthening facilities at design elevations 2538, 2552 and 2569 of the transit gas pipeline to Greece and FYROM, on the territory of Dolna Vasilitsa village, Kostenets municipality |
“Bulgargaz” EAD |
13.11.2005 13.03.2006 |
| Design and construction of strengthening facilities at design elevation 2493+55 of the transit gas pipeline to Greece, FYROM and Serbia in the gully crossing area on the territory of Tserovo village, Lisichevo municipality, Pazardjik region |
“Bulgargaz” EAD |
17.08.2005 27.03.2006 |
| Installation of strengthening facilities of gas pipeline at Malki Iskar river, in Roman town region |
“Bulgargaz” EAD |
20.12.2005 20.04.2006 |
| River Bank Protection works for gas pipeline in Ihtiman – Dupnitsa area and 21st section of the gas pipeline from Tserovo village, Lisichevo municipality, Pazardjik region |
“Bulgargaz” EAD |
17.08.2005 17.12.2005 |
| River Bank Protection works for gas pipeline, Krivodol town |
“Bulgargaz” EAD |
10.06.2005 10.10.2005 |
| River Bank Protection works for gas pipeline, Krapchane village |
“Bulgargaz” EAD |
10.06.2005 10.10.2005 |