| Emergency earth stabilization of landslide at km 379+000 at main road E-85 (1-5) Kardzhali-Cross Border Point Makaza |
TRACE Kardzhali JSC |
13.10.2011 21.12.2011 |
| Landslide stabilization and reconstruction of road section of Road III-376 Prevala-Rakitovo-Kostandovo km 10+100 |
Eko - Hidro - 90 LTD |
2010-2011 |
| Landslide stabilization of road IV - 16061 village Rebrovo - Yablanitsa |
Geolobby - Kiril Angelov SP |
08.12.2010 13.12.2010 |
| Construction of a drainage system around the temporary depots of Lead and Zinc Complex JSC, Kurdzhali |
Lead-Zink Complex JSC, Kurdzhali |
12.11.2010 10.06.2012 |
| Stabilization of transitions to gas pipeline branches from Bulgartransgaz transmission system in operational area of Valchi dol |
Bulgartransgaz EAD |
2010 |
| Stabilization of Main gas pipeline-south km 47,9 and its facilities |
Bulgartransgaz EAD |
2010 |
| Landslide stabilization in village Planinitsa, Pernik Region |
Pernik Municipality |
07.07.2010 07.09.2010 |
| Relocation and reconstruction of the TMF seepage collection system of Chelopech Mining EAD |
Chelopech Mining EAD |
07.2009 12.2009 |
| Engineering, procurement and construction of Sopot Waste Water Treatment Plant (WWTP) with inlet collector |
Sopot Municipality |
25.05.2009 10.06.2010 |
| Reconstruction of water-supply pressure pipeline from Main Pump Station ”Ormana” to “Borovetz” water tank, town of Yambol Ductile cast iron socket pipes for drinking water DN500mm, length 5724m HDPE pipes DN225, DN315 and DN560, length 580m |
Bulgarian Ministry of Regional Development and Public Works |
18.03.2009 14.06.2010 |
| Engineering, procurement and construction of Simeonovgrad potable water treatment plant – Equivalent residents – 8000 |
Bulgarian Ministry of Regional Development and Public Works |
2010 |
| Construction of administrative offices of the Ministry of Internal Affairs in Sofia – 3rd Police Regional Department, Sofia |
Ministry of Internal Affairs of Republic of Bulgaria |
05.02.2009 30.04.2010 |
| Landslide Stabilization of East Quarter of Oriahovo Town – 2nd stage at Danube River Bank Drilling and Casting in situ of 328 piles, φ 800mm, 16m and 14m unit depth; Drilling and Casting in situ of 34 piles, φ 400mm, 10m unit depth; Execution of steel concrete self-drilling anchors type ІВО R51/33 – 120pcs.х36m; 45pcs.х30m; type ІВО R38/17 – 17pcs.х12m |
Bulgarian Ministry of Regional Development and Public Works |
26.06.2008 Временно спрян поради липса на финансиране |
| Reconstruction of 8 floor administrative office building with covered parking of the State Commission for Security of Information in Sofia |
State Commission of Information Security, Bulgaria |
27.08.2007 31.05.2010 |
| Reconstruction of “Kiril & Metodii”, 117th Secondary School, Buhovo Town and 162nd Primary School “Father Paissiy”, residential area Botunets, Sofia |
Sofia Municipality Region”Kremikovtzi” Bulgaria |
05.12.2007 - 2010 |
| Construction of HDPE sewage pipeline in Anevo village, DN300”mm, length 2130m |
Sopot Municipality |
15.03.2007 30.04.2009 |
| Modernization and reconstruction of HDPE Water-supply network and Road infrastructure, town of Sarnitza (next to Velingrad) and the region, 28km, DN40 – 160mm |
Velingrad Municipality |
15.09.2008 31.08.2009 |