recent projects

Project

Client

Year

Emergency earth stabilization of landslide at km 379+000 at main road E-85 (1-5) Kardzhali-Cross Border Point Makaza TRACE Kardzhali JSC 13.10.2011 21.12.2011
Landslide stabilization and reconstruction of road section of Road III-376 Prevala-Rakitovo-Kostandovo km 10+100 Eko - Hidro - 90 LTD 2010-2011
Landslide stabilization of road IV - 16061 village Rebrovo - Yablanitsa Geolobby - Kiril Angelov SP 08.12.2010 13.12.2010
Construction of a drainage system around the temporary depots of Lead and Zinc Complex JSC, Kurdzhali Lead-Zink Complex JSC, Kurdzhali 12.11.2010 10.06.2012
Stabilization of transitions to gas pipeline branches from Bulgartransgaz transmission system in operational area of Valchi dol Bulgartransgaz EAD 2010
Stabilization of Main gas pipeline-south km 47,9 and its facilities Bulgartransgaz EAD 2010
Landslide stabilization in village Planinitsa, Pernik Region Pernik Municipality 07.07.2010 07.09.2010
Relocation and reconstruction of the TMF seepage collection system of Chelopech Mining EAD Chelopech Mining EAD 07.2009 12.2009
Engineering, procurement and construction of Sopot Waste Water Treatment Plant (WWTP) with inlet collector Sopot Municipality 25.05.2009 10.06.2010
Reconstruction of water-supply pressure pipeline from Main Pump Station ”Ormana” to “Borovetz” water tank, town of Yambol Ductile cast iron socket pipes for drinking water DN500mm, length 5724m HDPE pipes DN225, DN315 and DN560, length 580m Bulgarian Ministry of Regional Development and Public Works 18.03.2009 14.06.2010
Engineering, procurement and construction of Simeonovgrad potable water treatment plant – Equivalent residents – 8000 Bulgarian Ministry of Regional Development and Public Works 2010
Construction of administrative offices of the Ministry of Internal Affairs in Sofia – 3rd Police Regional Department, Sofia Ministry of Internal Affairs of Republic of Bulgaria 05.02.2009 30.04.2010
Landslide Stabilization of East Quarter of Oriahovo Town – 2nd stage at Danube River Bank Drilling and Casting in situ of 328 piles, φ 800mm, 16m and 14m unit depth; Drilling and Casting in situ of 34 piles, φ 400mm, 10m unit depth; Execution of steel concrete self-drilling anchors type ІВО R51/33 – 120pcs.х36m; 45pcs.х30m; type ІВО R38/17 – 17pcs.х12m Bulgarian Ministry of Regional Development and Public Works 26.06.2008 Временно спрян поради липса на финансиране
Reconstruction of 8 floor administrative office building with covered parking of the State Commission for Security of Information in Sofia State Commission of Information Security, Bulgaria 27.08.2007 31.05.2010
Reconstruction of “Kiril & Metodii”, 117th Secondary School, Buhovo Town and 162nd Primary School “Father Paissiy”, residential area Botunets, Sofia Sofia Municipality Region”Kremikovtzi” Bulgaria 05.12.2007 - 2010
Construction of HDPE sewage pipeline in Anevo village, DN300”mm, length 2130m Sopot Municipality 15.03.2007 30.04.2009
Modernization and reconstruction of HDPE Water-supply network and Road infrastructure, town of Sarnitza (next to Velingrad) and the region, 28km, DN40 – 160mm Velingrad Municipality 15.09.2008 31.08.2009
Results: 10 | 20 | 50


Print

tuf
tuf2
ser3