Emergency earth stabilization of landslide at km 379+000 at main road E-85 (1-5) Kardzhali-Cross Border Point Makaza TRACE Kardzhali JSC 13.10.2011 21.12.2011
Landslide stabilization and reconstruction of road section of Road III-376 Prevala-Rakitovo-Kostandovo km 10+100 Eko - Hidro - 90 LTD 2010-2011
Landslide stabilization of road IV - 16061 village Rebrovo - Yablanitsa Geolobby - Kiril Angelov SP 08.12.2010 13.12.2010
Construction of a drainage system around the temporary depots of Lead and Zinc Complex JSC, Kurdzhali Lead-Zink Complex JSC, Kurdzhali 12.11.2010 10.06.2012
Stabilization of transitions to gas pipeline branches from Bulgartransgaz transmission system in operational area of Valchi dol Bulgartransgaz EAD 2010
Stabilization of Main gas pipeline-south km 47,9 and its facilities Bulgartransgaz EAD 2010
Landslide stabilization in village Planinitsa, Pernik Region Pernik Municipality 07.07.2010 07.09.2010
Relocation and reconstruction of the TMF seepage collection system of Chelopech Mining EAD Chelopech Mining EAD 07.2009 12.2009
Engineering, procurement and construction of Sopot Waste Water Treatment Plant (WWTP) with inlet collector Sopot Municipality 25.05.2009 10.06.2010
Reconstruction of water-supply pressure pipeline from Main Pump Station ”Ormana” to “Borovetz” water tank, town of Yambol Ductile cast iron socket pipes for drinking water DN500mm, length 5724m HDPE pipes DN225, DN315 and DN560, length 580m Bulgarian Ministry of Regional Development and Public Works 18.03.2009 14.06.2010