News

Act 15 under contract for Landslide stabilization in village Planinitsa, Pernik Municipality

2010-10-01

On 08.09.2010 was signed Act 15 under contract for Landslide stabilization in village Planinitsa. The following stabilization works were executed: drainage of groundwater and surface drainage; stabili ...


Prime Minister Boyko Borisov attended the official opening of WWTP in Sopot

2010-09-17

On 05.09.2010 was presented the official opening of Sopot Waste Water Treatment Plant with inlet collector, constructed by consortium "GSM Power Engineering" with leader "Gasstroymontaj" JSC. The offi ...


Act 15 under contract for Reconstruction of water-supply pressure pipeline, Town of Yambol

2010-08-03

On 14.06.2010 "Gasstroymontaj" JSC successfully completed the contract for Reconstruction of water-supply pressure pipeline from main pump station "Ormana" to "Borovets" water tank, Town of Yambol - d ...


Act 15 under contract for construction of WWTP with inlet collector in Sopot

2010-07-15

On 10.06.2010 "Gasstroymontaj" JSC successfully completed the contract for construction of Sopot Waste Water Treatment Plant (WWTP) with inlet collector and signed Act 15. ...


Membership in AmCham (American Chamber of Commerce in Bulgaria)

2010-03-22

Since Jan. 2010 "Gasstroymontaj" JSC has become a regular member of the AmCham (American Chamber of Commerce in Bulgaria). ...


tuf
tuf2
ser3